Get the App
SLTechnology News&Howtos  ›  Internet Technology  › 

LoadRunner multi-computer load test

Shulou Source: shulou.com Published: 2022-06-03 04:48:59 11月25日 Update

This kind of problem will be encountered in the test. One LR machine can't keep up, and multiple machines need to test a scene at the same time.

This makes it easy to configure multi-machine load tests by creating scripts on the main LR, creating test scenarios, and using the scripts and scenarios of the master LR directly from the LR.

Note: the master LR and slave LR must maintain normal communication.

one。 Configure slave LR

Configure the agent environment from LR, as shown in the following figure

After the configuration is successful, you can see the red circle icon in the lower right corner.

two。 Configure the primary LR

1. Open "Load Generator", click "add", and add as many as you can from LR. The figure below is as follows

two。 After adding, click "Connect", wait for all the slave LR states to be "ready", and then run the scene.

Tags: Configuration test scenario script success simultaneous icon multiple performance machine state environment problem run communication Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Linux Microsoft MySQL Shulou Technology macOS