A preliminary study on the purchase of SAP MM MPN Materials of "SAP Technology"
A preliminary study on the purchase of SAP MM MPN Materials of "SAP Technology"
1. Maintenance of LINK relationship between MPN material number and our normal material master data
MPN material number 14000005
Our material no. 11000250
2. Maintenance of purchasing information records
PIR of our materials
PIR of MPN material number
3, the reflection on the purchase documents
3.1. maintenance of contract documents, main material number can be MPN material number
It can also be our material number.
3.2, purchase application, the main material number is our material number
Purchase order, you can use our material number, at this time the IM material field is blank
At this time, the PIR number obtained from PO is the PIR number of our material number.
3.4.The purchase order can also be placed with the MPN material number. At this time, the IM material field is not blank, indicating our material number.
At this time, the PIR number obtained in the PO is the PIR number of the MPN material number.
ME2M, use our material number to check the purchase order.
The material number in the query form includes both the MPN material number and our material number.
3.6. ME2M, use the MPN material number to query the purchase voucher, no data
2019-09-05 was written in Suzhou.