The eight hundred li Qinchuan line runs through, and the whole journey is about 380km.
CTOnews.com October 9 news, Weilai now announced that the Power Up Plan eight hundred miles of Qinchuan line, the whole process of about 380km, the layout of 8 exchange power stations, 5 overcharging stations, 1 mesh charging station. Starting from Baoji, passing through Xi'an, along the vein of Qinling Mountains, down the Weihe River, and finally to Xiyue Huashan.
In addition, the high-speed power exchange network of Shandong Peninsula urban agglomeration was officially opened on September 30, with a total of 32 high-speed power stations connecting 16 prefecture-level cities in Shandong province. covering G2 Beijing-Shanghai, G3 Beijing-Taiwan, G20 Qingyin, G25 Changshen Expressway and other major highways in the province
The Beijing-Tianjin-Hebei urban agglomeration high-speed power exchange network, Jiangxi Western Landscape Line, Southern Anhui Landscape Line, Heilongjiang Jingpohu Line and Zhejiang Expressway were completed at the end of September, covering G15 Shen-Hai Expressway, G60 Shanghai-Kunming Expressway, S26 Zhuyong Expressway, G1 Beijing-Harbin Expressway, G2 Beijing-Shanghai Expressway, G4 Beijing-Hong Kong-Macao Expressway and G45 Da-Guang Expressway.
CTOnews.com learned that in September 2022, Lailai delivered 10878 new cars; in the third quarter, 31607 new cars were delivered, an increase of 29.3% over the same period last year, a record quarterly delivery.
From January to September 2022, Xilai delivered 82434 new cars, an increase of 24.2% over the same period last year. A total of 249504 new Weilai cars have been delivered.