Get the App
SLTechnology News&Howtos  ›  IT Information  › 

All the fans in the first phase of the Baotou demonstration project of the three Gorges Energy Project have been hoisted, and the power consumption on the grid is about 700 million kilowatt-hours in the year after it is put into production.

Shulou Source: shulou.com Published: 2023-11-24 11:37:57 10月01日 Update

CTOnews.com, November 7, according to the official of the three Gorges Group, on November 2, the first phase of the 500000 kilowatt wind power project (hereinafter referred to as the Baotou demonstration Project) of the three Gorges Energy Comprehensive Application demonstration Zone in Baotou City, which belongs to the three Gorges Group, successfully completed the hoisting of all 31 turbines.

▲ Tuyuan: the three Gorges Group said that the Baotou demonstration project is one of the major energy projects in Inner Mongolia Autonomous region. The project is located in Damao Banner, Baotou City, and is located in the tuyere zone at the northern foot of Yinshan Mountain in the west of Inner Mongolia. it is rich in wind energy resources, which is conducive to the large-scale and centralized development and construction of onshore wind power.

CTOnews.com learned that data show that the planned capacity of the first phase of the three Gorges Energy Baotou demonstration Project is 200000 kilowatts, and the annual power supply after it is put into operation is about 700 million kilowatt hours, equivalent to saving about 217000 tons of standard coal and reducing carbon dioxide emissions by 591300 tons per year.

According to reports, at present, the installation and commissioning of equipment in the booster station has been completed, the secondary equipment has been electrified, and the booster station has electrified conditions.

Tags: Project three Gorges Baotou Energy demonstration Group equipment Inner Mongolia Baotou City electricity hoisting Major carbon dioxide hereinafter referred to as Northern foot region Typhoon Zone official capacity Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Redmi MariaDB Xiaomi Shulou Technology OPPO Reno