Get the App
SLTechnology News&Howtos  ›  IT Information  › 

With a design speed of 350 kilometers per hour, the first tunnel of the new Shanghai-Chongqing-Rong high-speed railway has been successfully completed.

Shulou Source: shulou.com Published: 2023-11-24 11:44:52 10月02日 Update

CTOnews.com, November 11, according to CCTV news, today, the Luojiacun tunnel in the Wuyi section of the Shanghai-Chongqing-Rong high-speed railway has been successfully completed, which is also the first tunnel on the Shanghai-Chongqing-Rong high-speed railway line.

The tunnel is located in Dangyang City, Yichang City, Hubei Province. it took 167 days to build, with a total length of 315 meters and a maximum buried depth of about 48.7 meters.

CTOnews.com learned that the new Shanghai-Chongqing-Rong high-speed railway is one of the national "eight vertical and eight horizontal" high-speed railway channels, passing through six provinces and cities, including Shanghai, Jiangsu, Anhui, Hubei, Chongqing and Sichuan, with a total length of about 2100 kilometers and a total investment of about 593 billion yuan.

It is reported that the new Shanghai-Chongqing-Rong high-speed railway will connect the Yangtze River Delta urban agglomeration, the urban agglomeration in the middle reaches of the Yangtze River and the Chengdu-Chongqing Shuangcheng economic circle, which is of great significance to the construction of the Yangtze River comprehensive transportation system and promoting the development of the Yangtze River economic belt.

Tags: High-speed rail tunnel Yangtze River all lines cities urban agglomeration economy Hubei speed per hour design major eight vertical and horizontal middle reaches transportation transportation system full length national CCTV general leng Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Microsoft Xiaomi Shulou Technology Shulou Tech Info Docker