In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2025-09-15 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)11/24 Report--
According to CTOnews.com news on November 14, Xilai has previously said that it will launch the third generation power station in 2023, but it has not released details about the new plant.
Weilai recently announced a number of patents on the replacement of the power station, some media said that this is the third generation of the replacement power station. According to the patent, the number of battery packs in the third generation power station will be increased to 22. In addition, the media said that the first three generations of Weilai will land in Nanxiang, Jiading, Shanghai.
Weilai "Power changing device and charging Station including this changing device" has developed a new changing device for batteries of "different specifications & sizes", which can make the adding and unlocking mechanism move to a position that matches different specifications of battery. improve the compatibility of the power changing device.
In addition, the "Control method for changing Power Station" gives the specific structural layout of the third generation station: it will be divided into charging bin, storage bin, and stacker. Among them, the charging chamber is divided into two columns, each column has 6 charging potentials. The storage bin is divided into 2 columns with 5 storage spaces in each column. In that case, a total of 3 generations of stations can hold 22 batteries.
There is also a patent for "battery compartment and charging station of the charging station", which can further upgrade the safety of the recharging station! When the risk battery is abnormal, the patent enables the support to release the risk battery, and the battery can quickly fall into the lower cooling cavity, so that the abnormal battery can be dealt with in time and reduce the safety risk.
CTOnews.com learned that the first second-generation power station in Weilai was officially opened at Sinopec Chaoying Station in Beijing on April 15, 2021, with a capacity of 13 batteries.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
The market share of Chrome browser on the desktop has exceeded 70%, and users are complaining about
The world's first 2nm mobile chip: Samsung Exynos 2600 is ready for mass production.According to a r
A US federal judge has ruled that Google can keep its Chrome browser, but it will be prohibited from
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
About us Contact us Product review car news thenatureplanet
More Form oMedia: AutoTimes. Bestcoffee. SL News. Jarebook. Coffee Hunters. Sundaily. Modezone. NNB. Coffee. Game News. FrontStreet. GGAMEN
© 2024 shulou.com SLNews company. All rights reserved.