Get the App
SLTechnology News&Howtos  ›  IT Information  › 

Intel tries to recapture its former glory: 20A and 18A processes are aimed at 2024, and Meteor Lake will not be delayed.

Shulou Source: shulou.com Published: 2023-11-24 13:13:48 11月14日 Update

CTOnews.com, December 6, 2008. At the recent IEDM 2022 (2022 IEEE International Electronic Devices Conference), Intel released a number of breakthrough research results and gave the latest roadmap, emphasizing that the company is maintaining a "fast pace" and that they not only need to stay on track, but also speed up delivery time.

According to Intel terminology, the entry point of the post-nano era is "Amy", that is, 1/10 nm. They will name the process nodes less than 2 nm 20A and 18A, and will launch / the first batch of High NA EUV devices using ASML (possibly 18A).

To put it simply, the Intel 20A process plans to enter the risk trial phase in the first half of 2024, while the 18A process will be ready in the second half of 2024.

In addition, Intel also confirmed that its upcoming Intel4 process is ready for production.

It is worth noting that the company mentioned that the process of "preparing for production" of the node corresponds to the timeline in which they expect the process to be in a risky production state. This means that Intel 4 is now in a state of risky trial production.

In other words, this may mean that the next generation of Meteor Lake will not be delayed until 2024, as some anecdotes suggest, but will arrive sometime in 2023.

▲ Tuyuan Intel, via:wccftech, also revealed that the 18A process plans to enter a risky trial production phase in February 2024.

In addition, Intel also confirmed that its 20A process will introduce both RibbonFET and PowerVias technology.

CTOnews.com Science Popularization: RibbonFET is a ring gate or nano-transistor structure, which is expected to extend Moore's Law like FinFET, while PowerVia is a back-end power transmission technology. The combination of the two is bound to bring considerable technological innovation.

Ann B Kelleher, general manager of Intel Technology Development, said:

"Moore's Law is about the integration of functional innovation, and when we look forward to the next 10 to 20 years, there will be a road full of innovation."

When asked about the transition to RibbonFET and PowerVias technologies in 20A, and considering the potential risks of the company's mistakes in 10nm processes, Ann Kelleher said:

"this doesn't need to be done right away, but we see a significant advantage of moving to PowerVia to enable RibbonFET technology. This has been very successful and enabled us to speed up our development efforts."

"Intel: the goal is to promote the five-stage process within four years, and the 14th generation Core Meteor Lake Q4 is expected to stream."

"sources say Intel is developing Raptor Lake Refresh,AMD Ruilong 7000X3D / APU to be released next year."

Tags: Intel Intel process technology risk company nanometer preparation development production that is law meaning time process message state node stage Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno NVidia Linux vpn Docker Shulou Tech Info