Get the App
SLTechnology News&Howtos  ›  IT Information  › 

The design speed is 350 kilometers per hour: it will arrive in about 2 hours, and the Guinan high-speed railway has entered the stage of operation and test.

Shulou Source: shulou.com Published: 2023-11-24 17:43:31 10月05日 Update

CTOnews.com, June 26 (Xinhua) according to the official account of China Railway Wechat, the Gui-Nan high-speed railway ended the joint commissioning and test phase today and officially entered the operation test phase.

▲ Tupu Source China Railway, the following operation test will test whether each system of the high-speed rail line can work properly through fault simulation, emergency rescue drill, train diagram parameter test and driving test according to the diagram, and verify whether the operation organization of the high-speed train can meet the operation requirements.

Guinan high-speed railway is the first high-speed railway with a designed speed of 350km / h in Guizhou and Guangxi. Once it is completed and opened to traffic, the time required to travel from Guiyang to Nanning will be reduced by about half to about 2 hours at the earliest. (CTOnews.com Note: it now takes more than 5 hours).

Tags: High-speed rail test operation railway hour stage Guinan train China driving speed design fastest two places public parameters failure mode time news Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Microsoft Linux NVidia Shulou Information Redmi