Get the App
SLTechnology News&Howtos  ›  IT Information  › 

The 2000 car exchange power station in Ulai was completed on the Silk Road.

Shulou Source: shulou.com Published: 2023-11-24 21:31:51 10月02日 Update

According to CTOnews.com news on October 26, Weilai announced today that the 2000 switching power station will be completed on the Silk Road, in the direction of Horgos, the service area of G30 Lianhuo Expressway in Baoji West.

Wei Lai said that with the change of the power station in Baoji West Service area, the electricity can be changed all the way from Lianyungang on the coast of the Yellow Sea to Tianshui, Gansu Province. 11 switching stations and 46 charging stations have been arranged on the Silk Road from Xi'an to Horgos. It will be possible to change electricity all the way to Xinjiang along the Silk Road through the Hexi Corridor in 2024.

In July 2022, the 1000 Weilai power station was replaced. After a lapse of 15 months, another 1000 exchange power stations were built in Weilai.

CTOnews.com checked the official website of Xilai and found that as of October 26, there were 2000 power stations, including 601 expressway power stations, 1867 overcharging stations, 1415 destination charging stations and 940000 + square piles.

Tags: Power station Silk Road Silk Service area Expressway Hall Baoji Horgos Road Service Silk Road Tripartite offline location charging Station Highway layout Direction Hexi Corridor message Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Linux Redmi Huawei OPPO Reno Shulou Tech Info