Get the App
SLTechnology News&Howtos  ›  IT Information  › 

Guangzhou: more than 3 hydrogen production stations and more than 50 hydrogen filling stations have been built during the 14th five-year Plan period.

Shulou Source: shulou.com Published: 2023-11-24 10:44:43 09月30日 Update

CTOnews.com September 21 news, today, Guangzhou City Development and Reform Commission issued "Guangzhou City hydrogen energy infrastructure development plan (2021-2030)"(hereinafter referred to as "planning").

CTOnews.com learned that the Planning mentioned that the planning objectives of the "14th Five-Year Plan" stage (2021-2025) are as follows: 1 new hydrogen production station will be built, and more than 3 hydrogen production stations will be built accumulatively; More than 50 hydrogen refueling stations will be built accumulatively; Carry out the construction of 1 - 2 hydrogen production and hydrogenation joint construction stations and 1-2 hydrogen storage stations (or rely on hydrogen production stations, hydrogen production and hydrogenation joint construction stations and hydrogen storage stations). The hydrogen production capacity for fuel cells is 35,000 kg/day (13,000 tons/year), and the hydrogenation capacity is not less than 40,000 kg/day (15,000 tons/year), which can meet the hydrogen demand for more than 6000 hydrogen fuel cell vehicles.

In addition, the planning objectives for 2026-2030 in the Plan are: more than 50 hydrogen refueling stations will be built, more than 100 hydrogen refueling stations will be built accumulatively, more than 5 hydrogen hydrogenation joint construction stations will be formed, and 3-4 hydrogen storage stations will be formed. The hydrogen production capacity of 100,000 kg/day (36,000 tons/year) fuel cell and the hydrogenation capacity of more than 100,000 kg/day (36,000 tons/year) can meet the commercial operation requirements of hydrogen fuel cell vehicles.

Tags: Hydrogenation hydrogen production planning fuel battery capacity target Guangzhou layout hydrogen demand Guangzhou stage hereinafter referred to as development planning commerce infrastructure hydrogen energy news Apple Docker Huawei Linux macOS MariaDB Microsoft MySQL NVidia OPPO Reno Xiaomi Linux vpn Shulou Technology Microsoft