With a designed top speed of 350 kilometers per hour, the Jing-Tang Jingbin inter-city railway began joint commissioning and joint test.
CTOnews.com August 14 news, according to CCTV news, August 12, Jingtang inter-city railway, Jingbin inter-city railway began a joint test, is expected to be open to traffic conditions by the end of this year.
Among them, the Jingtang intercity railway starts from Beijing City Deputy Central Station to Tangshan Station in Tangshan City, Hebei Province, passing through Tongzhou District of Beijing, Langfang City of Hebei Province, Baodi District of Tianjin City and Tangshan City of Hebei Province. The total length of the line is about 148.7 km, with a designed maximum speed of 350km per hour, with a total of 8 stations.
CTOnews.com learned that the Jingbin intercity railway starts from Baodi Station of Beijing-Tangshan Intercity Railway to Binhai West Station. The total length of the main line is about 96 km, with a design speed of 250km / h. There are four stations on the entire line. The initial construction and opening range is from Baodi Station to Beichen Station, with a line length of 56.2km.