The border town line of Jilin and Yanji in Weilai is officially completed, and the whole process is about 560km.
CTOnews.com August 19 news, Lulai officially announced today that the Jilin Yanji Border City Line has been officially completed, with the layout of two replacement power stations and six overcharging stations, connecting Jingyuetan Forest Park, Songhua Lake Scenic spot, Liudingshan Scenic spot, Riguangshan National Forest Scenic spot in Tumen River City, and Hunchun Fangchuan Scenic spot.
CTOnews.com learned that on July 31 this year, Lailai announced the official opening of Anhui high-speed power exchange network, with 18 power stations along the way, connecting 16 prefecture-level cities in Anhui, including G3 Beijing-Taiwan Expressway, G40 Shanghai-Shaanxi Expressway, G50 Shanghai-Chongqing Expressway, G35 Ji-Guang Expressway and other expressways.
Lailai delivered 10052 cars in July, up 26.7 percent from January to July 2022, and delivered 60879 new cars, up 22 percent from the same period last year. A total of 227949 vehicles have been delivered. As of July 31, 2022, the cumulative delivery volume of Xilai has reached 227949.
Weilai said that 2022 ES8, ES6 and EC6 models equipped with Alder intelligent system are coming to stores one after another; the test drive of medium and large smart electric SUV ES7 will be carried out in various cities one after another, and delivery is expected to start on August 28; ET7 orders continue to climb, and then production delivery will be accelerated.