Network Security Internet Technology Development Database Servers Mobile Phone Android Software Apple Software Computer Software News IT Information

In addition to Weibo, there is also WeChat

Please pay attention

WeChat public account

Shulou

Mei Yunling Heavenly Road: the Lijiang-Shangri-La railway was opened on November 26, with a maximum of 1 hour and 18 minutes between the two places.

2024-12-08 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >

Share

Shulou(Shulou.com)12/24 Report--

Thanks to CTOnews.com netizen for the clue delivery! CTOnews.com news on november 24, according to "china railway" public number today tweet, lijiang to shangri-la railway will be completed and opened to traffic on november 26, the fastest between the two places can be reached in 1 hour and 18 minutes, kunming via dali, lijiang can reach shangri-la directly.

According to introduction, this line is located in the transition zone between Yungui Plateau and Qinghai-Tibet Plateau, connecting Lijiang Ancient City, Lashihai, Yulong Snow Mountain, Tiger Leaping Gorge, Haba Snow Mountain, Shangri-La and many other famous scenic spots, known as "Beautiful Yunling Tianlu." This line starts from Lijiang Station, Yulong Naxi Autonomous County, Lijiang City, Yunnan Province, and connects to Shangri-La Station in Shangri-La City, Diqing Tibetan Autonomous Prefecture, Yunnan Province.

▲ The design speed of this line is 140 kilometers per hour and the total length is 139 kilometers. It is a national Class I single-track electrified railway. CTOnews.com includes the following stations:

Lijiang

lashihai

Daluo

xinshang

Tiger Leaping Gorge

luosiwan

Huajiaopo

Wanlamu

tangbu

xiaozhongdian

Luigi

Judugu

Shangri-La

Among them, Lijiang is an existing station, and the rest are new stations. Lijiang, Lashihai and Shangri-La stations opened passenger transport business, Xiaozhongdian Station opened passenger and freight transport business, and the rest of the stations were railway operation technical stations.

The construction of this line started in December 2014, and its altitude climbed from 2400 meters at Lijiang Station to 3274 meters at Shangri-La Station. It is a typical plateau railway, and the railway construction is extremely difficult.

At the initial stage of operation of the line, the railway department arranged 8 passenger trains every day, and Kunming, Dali and Lijiang stations could reach Shangri-La Station in 4 hours and 30 minutes, 3 hours and 58 minutes and 1 hour and 18 minutes respectively. At the initial stage of operation, the highest ticket price is 10% off the published ticket price, and the lowest is 30% off. The published ticket price can be inquired through Railway 12306.

Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.

Views: 0

*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.

Share To

IT Information

Wechat

© 2024 shulou.com SLNews company. All rights reserved.

12
Report