In addition to Weibo, there is also WeChat
Please pay attention
WeChat public account
Shulou
2024-12-08 Update From: SLTechnology News&Howtos shulou NAV: SLTechnology News&Howtos > IT Information >
Share
Shulou(Shulou.com)12/24 Report--
Thanks to CTOnews.com netizen for the clue delivery! CTOnews.com news on november 24, according to "china railway" public number today tweet, lijiang to shangri-la railway will be completed and opened to traffic on november 26, the fastest between the two places can be reached in 1 hour and 18 minutes, kunming via dali, lijiang can reach shangri-la directly.
According to introduction, this line is located in the transition zone between Yungui Plateau and Qinghai-Tibet Plateau, connecting Lijiang Ancient City, Lashihai, Yulong Snow Mountain, Tiger Leaping Gorge, Haba Snow Mountain, Shangri-La and many other famous scenic spots, known as "Beautiful Yunling Tianlu." This line starts from Lijiang Station, Yulong Naxi Autonomous County, Lijiang City, Yunnan Province, and connects to Shangri-La Station in Shangri-La City, Diqing Tibetan Autonomous Prefecture, Yunnan Province.
▲ The design speed of this line is 140 kilometers per hour and the total length is 139 kilometers. It is a national Class I single-track electrified railway. CTOnews.com includes the following stations:
Lijiang
lashihai
Daluo
xinshang
Tiger Leaping Gorge
luosiwan
Huajiaopo
Wanlamu
tangbu
xiaozhongdian
Luigi
Judugu
Shangri-La
Among them, Lijiang is an existing station, and the rest are new stations. Lijiang, Lashihai and Shangri-La stations opened passenger transport business, Xiaozhongdian Station opened passenger and freight transport business, and the rest of the stations were railway operation technical stations.
The construction of this line started in December 2014, and its altitude climbed from 2400 meters at Lijiang Station to 3274 meters at Shangri-La Station. It is a typical plateau railway, and the railway construction is extremely difficult.
At the initial stage of operation of the line, the railway department arranged 8 passenger trains every day, and Kunming, Dali and Lijiang stations could reach Shangri-La Station in 4 hours and 30 minutes, 3 hours and 58 minutes and 1 hour and 18 minutes respectively. At the initial stage of operation, the highest ticket price is 10% off the published ticket price, and the lowest is 30% off. The published ticket price can be inquired through Railway 12306.
Welcome to subscribe "Shulou Technology Information " to get latest news, interesting things and hot topics in the IT industry, and controls the hottest and latest Internet news, technology news and IT industry trends.
Views: 0
*The comments in the above article only represent the author's personal views and do not represent the views and positions of this website. If you have more insights, please feel free to contribute and share.
Continue with the installation of the previous hadoop.First, install zookooper1. Decompress zookoope
"Every 5-10 years, there's a rare product, a really special, very unusual product that's the most un
© 2024 shulou.com SLNews company. All rights reserved.